Join the 155,000+ IMP followers

railway-usa.com

High-Speed Rail Fastening Systems and Track Maintenance

Vossloh supplies rail fastening systems and High Speed Grinding technology to manage dynamic track loads across China's high-speed railway network.

  www.vossloh.com
High-Speed Rail Fastening Systems and Track Maintenance

 

Operating high-speed rail corridors at 350 kilometres per hour requires specialised track components and systematic lifecycle maintenance. To sustain infrastructure availability across national and regional lines, Vossloh has localised rail fastening systems, turnouts, and preventive maintenance equipment for China's rail transport sector.

China's high-speed rail infrastructure has expanded from the 120-kilometre Beijing–Tianjin line opened in August 2008 to a network exceeding 50,000 kilometres. At speeds up to 350 kilometres per hour, fastening systems must absorb substantial dynamic loads while holding rails in precise geometric alignment. On slab track structures widely used in high-speed rail infrastructure, elastic components are essential for cushioning and distributing mechanical forces. Maintaining reliability at this scale required localised production capacity, unified technical standards, and integrated lifecycle servicing.

Technical Solution And Responsibilities
Vossloh addresses these mechanical parameters through track hardware and preventive rail maintenance systems. At its Kunshan plant, Vossloh manufactures rail fastening systems for high-speed slab track, reaching 150 million tension clamps produced by early 2026. Additionally, a joint venture in Wuhu has manufactured turnouts since 2012. For track care, Vossloh deploys High Speed Grinding technology, which reprofiles rails preventively at speeds up to 80 kilometres per hour to remove minor surface wear before structural defects develop. The service portfolio also includes the HSG-city grinding train for urban networks and the VTM-compact milling machine.

Deployment And Implementation
Localisation began in 2006 with fastening orders for the Beijing–Tianjin and Wuhan–Guangzhou lines and the founding of Vossloh Fastening Systems China in Kunshan, where production started in 2007. Following an industry-wide safety review after the July 2011 Wenzhou rail accident, deliveries resumed in June 2012. High Speed Grinding debuted on the Beijing–Shanghai corridor in 2013, and a dedicated Kunshan rail services company followed in 2015. Twelve of China's 18 regional railway administrations utilise this grinding technology. Supporting regional densification, Vossloh secured two summer 2026 contracts for Shandong province's Jinan–Zaozhuang and Qingdao–Zhucheng high-speed lines, with Kunshan-manufactured deliveries starting in 2027.

Results And Operational Impact
Standardised rail infrastructure enables high passenger volumes, with Chinese railways recording 954 million passenger trips during the 62-day summer travel period in 2026, exceeding 15 million daily journeys. Regarding continuous track care, Eckhard Köppen, who helped establish the Kunshan site and led Vossloh's China operations for 13 years, states: "For a network of this scale, the question of how to keep the infrastructure permanently high-performing is part of it from the very beginning. Preventive maintenance is therefore part of a holistic understanding of asset preservation and availability."

Edited by Maria Brueva, Induportals editor – adapted by AI.

www.vossloh.com

  Ask For More Information…

LinkedIn
Pinterest

Join the 155,000+ IMP followers